I am currently running a TestStand 3.5 sequence where I Open, Run, and then Close inspections sequentially using ActiveX calls to VBAI Sever (3.0) created in LabVIEW 8.20. This is causing my test time to increase dramatically. I would like to be able to load the inspections I plan to run in memory during the ProcessSetup and then run them during the MainSequence when needed.
Is this possible?
Thank you.