09-18-2013 12:52 PM
Hello Is ther a way to importa an old VI from different project to a new VI?
In the new Vi I have this Tab Control, si the second tab will include the old Vi
Thanks.
09-18-2013 01:03 PM
This make little sense. A "Tab Control" is a container for objects that can exist on a vi front panel. It cannot contain a vi. A Tab control could contain a sub-panel and a vi can be loaded into a sub-panel but there are some provisos (e.g. events change scope to the vi containing the subpanel rather than the vi loaded into the subpanel)
What are you really triing to do?
09-18-2013 01:04 PM