LabVIEW

cancel
Showing results for 
Search instead for 
Did you mean: 

How to convert simulation time in seconds(s) to hours(h) ?

Pls, i want set my simulation time in hours not in seconds while configuring simulation parameters. How do this?

0 Kudos
Message 1 of 9
(3,663 Views)

Please clearly explain what you want to do and where you want to apply?....

 

Smiley Wink

-----

The best solution is the one you find it by yourself
0 Kudos
Message 2 of 9
(3,658 Views)

I am simulating a hydraulic system and the simulation time has to be in hours for me to see the response clearly. In the simulation parameter the final time is in seconds i want to use hours, how do i change it to hours? Thanks

0 Kudos
Message 3 of 9
(3,638 Views)

Its possible depending on the architecture you use... Can you post the VI that you made for simulation....

 

Smiley Wink

-----

The best solution is the one you find it by yourself
0 Kudos
Message 4 of 9
(3,631 Views)

Is there any  need to post the VI, pls, tell me what to do. Thanks

0 Kudos
Message 5 of 9
(3,624 Views)

Ya it will let us to give a clear solution that you need.... Before posting it save it in LV 8.6 and post...

 

Smiley Wink

-----

The best solution is the one you find it by yourself
0 Kudos
Message 6 of 9
(3,620 Views)

Pls, tell me what to do, the problem is to have simulation time axis to be in hours not in seconds as it is in the simulation parameters, i think this has nothing to do with codes. thanks 

0 Kudos
Message 7 of 9
(3,602 Views)

@DALIB wrote:

Pls, tell me what to do, the problem is to have simulation time axis to be in hours not in seconds as it is in the simulation parameters, i think this has nothing to do with codes. thanks 


Without your code it is very hard to understand enough of your problem to help you. We need at least your graph/chart with your data. So if your project is some top secret weapon program, or something else very hush hush (which I find hard to believe). Do at least this. Then you have run your program, and have data in your graph/chart. Stop the program, and copy your graph/chart to a new VI. Then select make current values default. Save the VI, and zip it and post it



Besides which, my opinion is that Express VIs Carthage must be destroyed deleted
(Sorry no Labview "brag list" so far)
0 Kudos
Message 8 of 9
(3,596 Views)

x3600  Smiley Wink

0 Kudos
Message 9 of 9
(3,575 Views)