How to Copy Variables in Distributed System Manager from PC1 to PC2

dear all 

 

We are working with a cRIO‑9068 connected to a PC for plant monitoring and control, designed with DSC. The application is running successfully on PC1.

We would like to add a second PC as a backup. To achieve this, we copied the full project along with the Run‑Time Application to PC2. The application runs correctly, but we are facing an issue with Distributed System Manager (DSM):

  • On PC2, the process has been created in DSM.

  • However, the variables are not automatically added under this process.

Our questions are:

  1. How can we add all variables under the process in DSM on PC2?

  2. Is there a way to copy all variables directly from PC1 to PC2?

Note: The variables are already deployed on the cRIO.

 

Any guidance or best practices would be greatly appreciated.

 

best regards 