NI TestStand

cancel
Showing results for 
Search instead for 
Did you mean: 

Introduction of flow control and synchronization steps in Test Description

Hi ALL,

 

          I am working on developing of Test Scripts in ATML standards. Can any one inform me how to introduce flow control (if, else, end, for, while, break etc)  and synchronization (wait etc) steps into the Test scripts. Thanks in advance.

 

 

With Best Regards,

Kalyan 

0 Kudos
Message 1 of 1
(3,520 Views)