Multisim and Ultiboard

取消
显示结果 
搜索替代 
您的意思是: 

ultiboard v10

已解决!
转到解答

I want to copy an existing pc board layout into a new project.  The new project's board outline has mounting holes of the same size and in the same locations as the existing project, but the new board is larger.  Using one of the mounting holes as a reference point, I'd like to paste the existing layout into the new project.  Need some help with this please.

 

I am using Ultiboard V10.0.144.

 

Thanks   

0 项奖励
1 条消息(共 3 条)
4,972 次查看
解答
已被主题作者 Joepuck 接受

Hi Joe,

Make sure all your selection filter are enabled, have a look at this link if you are not sure what I am talking about: http://www.ni.com/white-paper/13271/en. To copy one design to another, simply press Ctrl+A then Ctrl+C. In the new design, select Ctrl+V or Edit>>paste with net if you want to import the nets from the old design.

Have a look at this move multi object KB, it may be useful.

 

http://digital.ni.com/public.nsf/allkb/5AB46D3D8B5461EA86257AFB005C3116

Tien P.

National Instruments
0 项奖励
2 条消息(共 3 条)
4,955 次查看

Yep, simple copy and paste with nets worked great.  Being new to the program, I didn't know how to unlock locked objects but I figured this out too.  Thanks very much!

0 项奖励
3 条消息(共 3 条)
4,945 次查看