Hi,
thanks so far for your answer. So I checked the VI at LV ver. 7.1 and 8.2. At both it's the same behavior. I attached a VI with a loop at the beginning for data creation. At this test VI another thing is strange. With the two inputs 'Row' and 'Column' I want to handle the graph storage. So I expect if both are 0 storage is beginning at the upper left element. Not in this example! The other behavior is like described first. Also if I build a application.
So test it and maybe you can give me some hints.
Thanks!
06-20-2007 09:15 AM