03-22-2019 06:54 AM
Hello,
I try to sample NI 9220 at maximum speed (100kS/s/ch) with NI 9221 (200 kS/s) and get synchronised data acquisition. What is the best solution for this problem?
Solved! Go to Solution.
03-22-2019 12:50 PM - edited 03-22-2019 12:54 PM
Put them in independent loops each sampling at your requested rate. The data should by synchronized because both loops are being derived from the 40MHz base clock. That is, the 200kS loop should be taking a sample once every 200 clock cycles of the 40MHz clock and the 100kS look should be running once ever 400 clock cycles.
03-25-2019 11:23 AM
Thanks for your reply. I get data with different sample rate. But there is a uncertain delay between the two different of both loops. How can I avoid this starting delay or how can I synchronize the starting data acquisition?
04-03-2019 02:10 AM
Support recommend to use User-Controlled I/O sampling for NI 9220 (with Generate I/O Sample Pulse Method) and I/O node for NI 9221. Delays can be adjusted with feedback node.