05-21-2020 01:46 PM
Is it possible to run different sequences using the parallel model. Meaning for Socket 0 Seq A is running, Socket 1 Seq B, etc. Ideally what I want to do is use the parallel model to for a 6 socket unit, however I need the ability to change the sequence for each socket as some will run different products. Everything I've seen so far either runs everything from one sequence.
Solved! Go to Solution.
05-22-2020 02:14 AM
Check this: https://zone.ni.com/reference/en-XX/help/370052AA-01/tsexamples/infotopics/dynamic_client/
Alternatively (and easier) create one common sequence with calls to all you specific sequences and set proper precondition for them. I did not tested that but it should work 😉 Something like this:
Remember to deal with proper resource sharing!
05-22-2020 09:14 AM
Thank you, I'll give that a try. The only challenge would be allowing someone to add new sequences in the future. I wouldn't want too many people altering the parallel model.
05-22-2020 09:31 AM
You don't need to alter process model. Create a seq file with calls to all the specific seq calls and run that MAIN seq file with parallel process model.