03-13-2017 01:12 AM
Hi all ,
I have basic knowledge of Teststand And I have given a task to create a Test Automation of ECU (Management ECU , Transmission ECU) . We have LabVIEW 2015 , Teststand 2015. When I search for Test automation using NI teststand , I found NI veristand is useful for real time test application. Referred link are
http://www.ni.com/white-paper/13062/en/
By referring these, I get confused in Veristand and Teststand as
1. Veristand runs on Real time system where Teststand does not. But If I use Real time chassis with Teststand ,then whether system would be same (except timing parameter) or different? Because Veristand steps are called from Teststand itself And It is possible to design the sequences in teststand using LabVIEW modules as adapter which run on Real time.
Where can I get more details for comparing Veristand and Teststand .
Please suggest.
Solved! Go to Solution.
03-13-2017 03:16 AM
You should call your local NI office. They usually are glad if they can talk with you about these questions.
Depending on the schedule, it is possible that someone can visit you on site as well and talk directly with you in person. During those visits, maybe small demonstrations are possible.
03-13-2017 04:30 AM
Thank you Norbert_B.
By the time , Can you please share any link or knowledge base to have more detail.
03-13-2017 08:05 AM
Simplified answer:
Focus of VeriStand is HIL (Hardware In the Loop) and hardware abstraction. Determinism (real time) is mandatory for HIL application.
Focus of TestStand is Automated Test with great flexibility and reporting mechanism. TestStand requires external program code to access hardware.
Esp. the last point of TestStand can make VeriStand a good "partner" for TestStand. Also a more complex system requireming RT and flexibility can be covered with both tools together.
03-14-2017 11:08 PM
Thank you very much.