12-09-2011 09:36 PM
I am really struggling here with this (what seems) fairly simple labview problem. I have a set of equations that rely on the answer of the previous other formula and so forth. I can do this easily enough in excel. I tried to recreate this function in labview and have been really struggling to get it to work. I have tried using while loops and for loops, which I think is what I need to do here, but I haven't had much success. Anyways, I attached the spreadsheet with the two formulas, a .png showing the relationship of the formulas in the spreadsheet, and my .VI. Thanks for your help in advance.
Solved! Go to Solution.
12-09-2011 09:49 PM
You need both a loop and a shift register.
Lynn
12-09-2011 10:16 PM
Thank you! Worked perfectly