Benchtop Measurement and Test
Distributed Measurement and Control
High-Performance Test
Systems Engineering Software
Perspectives showcases how NI sees what’s next in the world of test and technology.
You can request repair, RMA, schedule calibration, or get technical support. A valid service agreement may be required.
Provides support for NI data acquisition and signal conditioning devices.
Provides support for Ethernet, GPIB, serial, USB, and other types of instruments.
Provides support for NI GPIB controllers and NI embedded controllers with GPIB ports.
From Friday, April 19th (11:00 PM CDT) through Saturday, April 20th (2:00 PM CDT), 2024, ni.com will undergo system upgrades that may result in temporary service interruption.
We appreciate your patience as we improve our online experience.
03-21-2016 08:41 AM
Hi,
I have two seperate digital signals into my myDAQ. The signals are activated at the right time, seen in MAX.
I want to measure the time between riseedge for the first signal and the riseedge for the second signal. I try to do this with two edge measurment.
The problem is that now it measures how long the first signal is activated. Can someone give me an explanation?
03-23-2016 08:57 AM
Hi KarlMartin,Could you provide your VI or a screen shot of your VI in the post.Something you could also try is to save the system times when you detect the edges of your system and substract the one from the other. Kind regards,Guy