I need to be able to cycle power to my cPCI chassis in order to test a PMC board. I am constructing a test system. So, rebooting
at the end of each board test is not acceptable. When power is cycled, the optical link shuts down and will not restart.
Thanks, in advance, for the help on this.
>>Eric