01-25-2007 09:02 AM
Hi,
I have a CVI application (loaded on Startup of a PC) which calls my modified CVI TestStand Test Executive. When I execute the Test Executive there is a delay while the TestStand engine is loaded.
I would rather have the delay up front so, is there anyway I can pre-load the TestStand engine in my calling CVI application to remove this delay?
Thanks
James.
(CVI 8.0.1, TestStand 3.5)
01-25-2007 11:57 AM