Multifunction DAQ

cancel
Showing results for 
Search instead for 
Did you mean: 

USB 6008 relay switching speed? Delay through software?

Solved!
Go to solution

I asume:

- you need to do the testing because there is a requirement.

- you need something like 1-2 ms timing resolution to make brownout/ power down tests on your products.

- with USB 6008 software timing jitter, relay timing jitter and bouncing.....   how do want to repeat a test (get the same result under the same conditions) if your switching condition is not stable?

 

you can have it : good, cheap and fast .... pick two 😉

 

One hint for a solution: have a look into the standards on how to perform such test.

Greetings from Germany
Henrik

LV since v3.1

“ground” is a convenient fantasy

'˙˙˙˙uıɐƃɐ lɐıp puɐ °06 ǝuoɥd ɹnoʎ uɹnʇ ǝsɐǝld 'ʎɹɐuıƃɐɯı sı pǝlɐıp ǝʌɐɥ noʎ ɹǝqɯnu ǝɥʇ'


0 Kudos
Message 11 of 12
(1,692 Views)

Its not meant to be used for compliance testing. Its meant to be used for prototyping tests. But its a long story. 

0 Kudos
Message 12 of 12
(1,685 Views)