Motion Control and Motor Drives

cancel
Showing results for 
Search instead for 
Did you mean: 

run 2 tdc001controller at same time

how to run 2 tdc001 controller at the same time,below is my design and i cant run and get reading at the same time.The another motor run after the first motor run.

0 Kudos
Message 1 of 2
(5,428 Views)

Hi,

 

Good day to you. Have you tried looking at the flow of the code (using highlight execution)? Can you check if data flow for both lines of code is simultaneous?

 

I found another link which explains how to cope with calling multpile and parallel activeX instances. It is related to increasing the number of threads LabVIEW allocates per execution system.

 

http://forums.ni.com/t5/LabVIEW/Calling-Multiple-and-parallel-ActiveX-instances/td-p/704543

 

Regards,

Alan

Applications Engineer | National Instruments
Singapore (65) 6226 5886 | Malaysia (60) 3 7948 2000 | Thailand (66) 2 298 4800
Philippines (63) 2 659 1722 | Vietnam (84) 28 3911 3150 | Indonesia (62) 21 2783 2355
0 Kudos
Message 2 of 2
(5,325 Views)