07-14-2010 03:50 AM
Hi,
I would like to check an issue regarding my VI. I have simulation and control loop and the task is expected to complete in 50s. My time step is 0.01s. I wish to know if it is possible to capture this simulation time? Let me elaborate. My output from the simulation and control loop is the velocity in the X, Y and Z axis. As the velocity is changing dynamically, i need to output the velocity together with the simulation time as i need to verify the time and velocities yielded. Please advise. Thank you.
07-14-2010 12:54 PM
Hello Prince Boeing,
You can use Simulation Time Waveform VI as it will automatically index your signal value with simulation time.
Or you can get the simulation time using the following
Hope this helps.