Does TS have some way of keeping track of the state of instruments as left by the previous test, so that the setup for the next test will consist only of changing the settings that need to be changed? The idea is to minimize the time required for an entire series of consecutive tests by chaining each from the previous, instead of having each test be completely modular with its own setup and cleanup, as this would involve too many redundant steps. There would be one full setup stage before the first test, and a full cleanup after the last test.
Apologies if this question is too elementary, and thanks in advance for helpful replies.