Problem:
Possible solution. Configuration: Suppose you had 5 Ethernet cDAQ 8 slot chassis. Start off by making a simple configuration work first, then extrapolate to more complicating network configurations. Therefore make all the chassis on the same subnet and maybe a dedicated subnet. Each cDAQ is 100s of feet from the other. You want to sample data at 1000 samples per second on all chassis and either lock all the sample clocks, or adjust the clocks on the fly, or know how much the sample clocks differ and adjust the times after the data is transferred.
This continues to go on (in the background) to detect clock drift. Obviously after the data acquisition starts the network traffic will increase, and that will cause the number of minimum packet loop times to be less than 127 out of 1000. But we should be able to determine a minimum number of minimums that will give reliable results, especially since we know beforehand the amount of traffic we will be adding to the network once the data acquisition starts. We may find out that an Ethernet bus utilization of less than 25% will give reliable results. Reliable because we consistently get loop times that are never less than some minimum value (within 10 us).
Remember, a histogram of the loop times should show a second peak at this minimum loop time. This 2nd peak is an indication of whether this idea will work or not. The “tightness” of this 2nd peak is an indication of the accuracy of the timestamp that is possible. This 2nd peak should have a much smaller standard deviation (or even a WALL at the minimum - see image). Since this standard deviation is so much smaller than the overall average of the loop time, then it is a far better value to use to sync the cDAQ chassis. If it is “tight” enough, then maybe additional time syncing can be done (more accuracy, timed to sample clocks, triggers, etc.).
Example, now that the clock are synced to within 10 us, the software initiated start trigger could be sent as a start time, not as a start trigger. In other words, the master cDAQ Ethernet driver would get a start trigger from LabVIEW and send all the slaves a packet telling them to start sampling at a specific time (computed as 75 milliseconds from now).
I mentioned parts of this idea to Chris when I called in today for support (1613269) on the cDAQ Ethernet and LabVIEW 2010 TimeSync. Chris indicated that this idea is not being done on any of your hardware platforms yet. By the way, Chris was very knowledgeable and I am impressed (as usual) with your level of support and talent of your team members.
Having observed, somewhat from a distance (pun not intended), the efforts that went into the IEEE 1588 standard, I worry about inventing a new standard.
I wonder if this could just be a request to support 1588 on cDAQ for Ethernet. We have 1588 on RIO and PXI.
You must be a registered user to add a comment here. If you've already registered, please log in. If you haven't registered yet, please register and log in.
Post New Idea to submit a product idea. Be sure to submit a separate post for each idea.
My Profile | Privacy |
Legal |
Contact NI
© 2011 National Instruments Corporation. All rights reserved. | E-Mail this Page
|
||

E-Mail this Page